4.8 KWP GTZ

  Location: Kleyaat, keserwan Year executed: 2010 Modules type: Poly-Crystalline Modules quantity:  4.8 kWp Inverters capacity: 3 x 4 kW System type: Three phase Off Grid Client: GTZ  

1.2 KWP AIN EBEL MUNICIPALITY

  Location: Ain Ebel, South of Lebanon Year executed: 2009 Modules type: Mono-Crystalline Modules quantity:  1.2 kWp Inverters capacity: 4 kW System type: Off Grid Client: Cedro – UNDP  

1.2 KWP KFARKELA FIRST PUBLIC SCHOOL

  Location: Kfarkela, South of Lebanon Year executed: 2009 Modules type: Mono-Crystalline Modules quantity:  1.2 kWp Inverters capacity: 4 kW System type: Off Grid Client: Cedro – UNDP  

1.8 KWP KFARSHOUBA INTERMEDIATE SCHOOL

  Location: Kfarshouba, South of Lebanon Year executed: 2009 Modules type: Mono-Crystalline Modules quantity:  1.8 kWp Inverters capacity: 4 kW System type: Off Grid Client: Cedro – UNDP  

1.2 KWP HOULA MUNICIPALITY

  Location: Houla, South of Lebanon Year executed: 2009 Modules type: Mono-Crystalline Modules quantity:  1.2 kWp Inverters capacity: 4 kW System type: Off Grid Client: Cedro – UNDP  

63 KWP PV STREET LIGHTING SYSTEM IN AKKAR REGION, NORTH LEBANON

250 PV Street Lighting Poles of 63 KWp in Akkar Region, North of Lebanon Location: Akkar Region Year executed: 2014 Modules type: Mono-Crystalline Modules quantity:  63 kWp System type: PV stand alone system Number of PV poles: 250 System specifications: 8 meters galvanized poles, 2×100 Wp Pv modules, 70 W led lamp, dimmable driver, 20 A charge controller, 2×160 Ah gel […]

1.2 KWP ATYEET PUBLIC SCHOOL

  Location: Atyeet, South of Lebanon Year executed: 2009 Modules type: Mono-Crystalline Modules quantity:  1.2 kWp Inverters capacity: 4 kW System type: Off Grid Client: Cedro – UNDP  

160 KWP PV STAND ALONE STREET LIGHTING SYSTEMS

The ministry of energy announced a bid for 800 poles PV street lighting to be distributed for the municipalities all over Lebanon. SOLANET won the bid and executed the project with high quality products according to the requested specifications. Products supplied and installed by SOLARNET for this project are high quality with CE and ISO […]

77 kWp On grid system CC Technique Factory

Solarnet executed Hybrid PV system including the installation of 693 PV module thin film of 100Wp on roof of the building, with 6 x 12 kW and 1 x 5 kw inverters in the electrical room. The PV system provide an electrical back up for the factory in Naher Ibrahim all sunny days. The PV system […]